User Tools

Site Tools


construction:quality_assurance:measure_serial_renovation

This is an old revision of the document!


Quality assurance measures during (serial) renovation

QA during planning phase

Position of the thermally insulated and airtight envelope

The thermally insulated and airtight building envelope must be designed with as few gaps as possible. With regard to the position of the insulation layer, there are several options in old buildings, which must be evaluated differently with regard to thermal bridge effects.

  • Course of the insulation layer in the area of the cold cellar
  • Course of the insulation layer in the area of the upper building closure: top storey ceiling or roof
  • Dealing with the heated staircase in the area of the cold cellar and the unheated roof space

For the position of the airtightness layer, see the separate airtightness checklist.

Thermal bridge analysis has to be done

  • at the perimeter in combination with the basement ceiling
  • at verge and eaves,
  • at the transition of the façade element ─ to the top storey ceiling. Only provide fire protection plates in the rear ventilation space of the outer skin. They must not pass through the insulation level.

====

construction/quality_assurance/measure_serial_renovation.1729778101.txt.gz · Last modified: by yaling.hsiao@passiv.de