User Tools

Site Tools


planning:thermal_protection:windows:editing_passive_house_windows_tender_specifications:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
Last revisionBoth sides next revision
planning:thermal_protection:windows:editing_passive_house_windows_tender_specifications:start [2015/07/03 14:19] – created kdreimaneplanning:thermal_protection:windows:editing_passive_house_windows_tender_specifications:start [2015/07/03 15:36] alang
Line 13: Line 13:
  
  
-\\ +**1. Tender specification for PH windows as a product to be delivered:**{{:picopen:doc1.doc|}}   \\ 
-**1. tender specification for PH windows as a product to be delivered:** {{:picopen:doc1_general_description_phwindow_vertical_only_delivery_en.doc|}} +**2. Tender specification for PH window fixing and installation:** {{:picopen:doc2.doc|}}
-   +
-**2. tender specification for PH window fixing and installation:** {{:picopen:doc2_general_descritpion_phwindow_vertical_only_installation_en.doc|}} +
    
planning/thermal_protection/windows/editing_passive_house_windows_tender_specifications/start.txt · Last modified: 2015/08/07 07:32 by kdreimane