planning:refurbishment_with_passive_house_components:overall_retrofit_plan_for_step-by-step_retrofits_to_enerphit_standard [2016/09/28 17:23] – kdreimane | planning:refurbishment_with_passive_house_components:overall_retrofit_plan_for_step-by-step_retrofits_to_enerphit_standard [2016/09/29 12:18] – francis.bosenick@passiv.de | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | {{: | ||
+ | \\ \\ \\ | ||
+ | |||
+ | |||
+ | |||
====== Overall retrofit plan for step-by-step retrofits to EnerPHit Standard ====== | ====== Overall retrofit plan for step-by-step retrofits to EnerPHit Standard ====== | ||
Line 11: | Line 16: | ||
===== 2 Practical implementation across Europe ===== | ===== 2 Practical implementation across Europe ===== | ||
- | [{{: | + | [{{: |
Out of 20 pilot projects started within EuroPHit, 11 case study projects with at least one retrofit step have been completed by April 2016, 9 more projects are currently ongoing and will have completed retrofit measures after the project completion. Building types and retrofit measures range from single-family homes to residential social high-rise buildings, where the EnerPHit Standard was implemented completely except for a more efficient heating system, which could not be installed for now. In other multi-family buildings, only one dwelling was improved to achieve a high efficiency and comfort level, whereas in non-residential buildings, retrofit measures consisted of the renewal and efficiency improvement of the flat roofs of only a section of the whole school building. In EuroPHit, a total budget of 26 million Euros has been foreseen to start or complete retrofit processes of more than 40.000 m² of floor area to EnerPHit Standard. | Out of 20 pilot projects started within EuroPHit, 11 case study projects with at least one retrofit step have been completed by April 2016, 9 more projects are currently ongoing and will have completed retrofit measures after the project completion. Building types and retrofit measures range from single-family homes to residential social high-rise buildings, where the EnerPHit Standard was implemented completely except for a more efficient heating system, which could not be installed for now. In other multi-family buildings, only one dwelling was improved to achieve a high efficiency and comfort level, whereas in non-residential buildings, retrofit measures consisted of the renewal and efficiency improvement of the flat roofs of only a section of the whole school building. In EuroPHit, a total budget of 26 million Euros has been foreseen to start or complete retrofit processes of more than 40.000 m² of floor area to EnerPHit Standard. | ||
\\ \\ | \\ \\ | ||
Line 100: | Line 105: | ||
+ | |//The sole responsibility for the content of Passipedia lies with the authors. \\ | ||
+ | While certain marked articles have been created with the support of the EU, they do not necessarily reflect the opinion of the European Union; \\ | ||
+ | Neither the EACI nor the European Commission are responsible for any use that may be made of the information contained therein.//| \\ | ||
+ | \\ |