planning:refurbishment_with_passive_house_components
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
planning:refurbishment_with_passive_house_components [2025/06/30 15:05] – [Quick and easy retrofit measures] yaling.hsiao@passiv.de | planning:refurbishment_with_passive_house_components [2025/06/30 15:08] (current) – [Economic feasibility] yaling.hsiao@passiv.de | ||
---|---|---|---|
Line 16: | Line 16: | ||
==== How we renovate matters ==== | ==== How we renovate matters ==== | ||
- | Poor quality | + | Poor quality |
- | [{{: | + | [{{: |
==== Benefits of deep energy refurbishment ==== | ==== Benefits of deep energy refurbishment ==== | ||
Line 58: | Line 58: | ||
===== Economic feasibility ===== | ===== Economic feasibility ===== | ||
- | [{{ : | + | [{{ : |
For achieving cost efficiency, it is crucial to couple the energy-saving measures with renovation measures that would have been necessary in any case. For example, if the facade needs to be renovated anyway, then the additional expenditure for simultaneous thermal insulation to the Passive House Standard will remain manageable. Nowadays, it is possible to carry out better measures at low differential costs, later installation would require the same effort once again for scaffolding, | For achieving cost efficiency, it is crucial to couple the energy-saving measures with renovation measures that would have been necessary in any case. For example, if the facade needs to be renovated anyway, then the additional expenditure for simultaneous thermal insulation to the Passive House Standard will remain manageable. Nowadays, it is possible to carry out better measures at low differential costs, later installation would require the same effort once again for scaffolding, |
planning/refurbishment_with_passive_house_components.1751288708.txt.gz · Last modified: by yaling.hsiao@passiv.de