User Tools

Site Tools


planning:refurbishment_with_passive_house_components

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
planning:refurbishment_with_passive_house_components [2025/04/23 14:55] – [Five Passive House principles applied to existing buildings] yaling.hsiao@passiv.deplanning:refurbishment_with_passive_house_components [2025/04/24 14:56] (current) – old revision restored (2025/04/24 14:21) yaling.hsiao@passiv.de
Line 73: Line 73:
 ===== Performance monitoring ===== ===== Performance monitoring =====
  
-The best proof of concept is always in-use performance monitoring. Positives results of EnerPHit renovations have been demonstrated and documented. Here are some examples and relevant articles: +The best proof of concept is always in-use performance monitoring. Positives results of EnerPHit renovations have been demonstrated and documented. Here are some examples and relevant articles:
  
-  * [[operation:operation_and_experience:measurement_results:energy_use_measurement_results#3. Refurbishment with Passive House components|Performance results of retrofit projects]]+  * [[:operation:operation_and_experience:measurement_results:energy_use_measurement_results#refurbishment_with_passive_house_components|Performance results of retrofit projects]]
   * [[:construction:quality_assurance:nuremberg_case_study|Nuremberg Case Study in detail]]   * [[:construction:quality_assurance:nuremberg_case_study|Nuremberg Case Study in detail]]
-  * [[planning:refurbishment_with_passive_house_components:living_quality_monitoring|]] +  * [[.:refurbishment_with_passive_house_components:living_quality_monitoring|]]
  
  
planning/refurbishment_with_passive_house_components.1745412903.txt.gz · Last modified: by yaling.hsiao@passiv.de