planning:refurbishment_with_passive_house_components:thermal_envelope:airtightness

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
planning:refurbishment_with_passive_house_components:thermal_envelope:airtightness [2019/06/28 08:59] – [Basic principles for planning airtightness] cblagojevicplanning:refurbishment_with_passive_house_components:thermal_envelope:airtightness [2019/06/28 08:59] – [Airtightness – how and why?] cblagojevic
Line 13: Line 13:
 In particular, airtightness has the following advantages: In particular, airtightness has the following advantages:
   * prevention of moisture related building damage   * prevention of moisture related building damage
 +
   * prevention of drafts and cold feet   * prevention of drafts and cold feet
 +
   * prevention of high heat losses due to infiltration   * prevention of high heat losses due to infiltration
 +
   * improvement of sound insulation   * improvement of sound insulation
 +
   * improved indoor air quality (e.g. prevention of pollution with radon from the ground)   * improved indoor air quality (e.g. prevention of pollution with radon from the ground)
  
 An adequate level of airtightness is the basis for: An adequate level of airtightness is the basis for:
   * the use of a variable demand-oriented ventilation (functioning with directed air flows) and   * the use of a variable demand-oriented ventilation (functioning with directed air flows) and
 +
   * the effectiveness of the thermal insulation without air flowing through it   * the effectiveness of the thermal insulation without air flowing through it
  
Line 181: Line 186:
 Therefore, in new constructions as well as in modernisations, in practice particular attention must be paid to the following points for implementing an airtight building envelope: Therefore, in new constructions as well as in modernisations, in practice particular attention must be paid to the following points for implementing an airtight building envelope:
   * Preliminary planning   * Preliminary planning
 +
   * Coordination of the trades (order)   * Coordination of the trades (order)
 +
   * Time schedule   * Time schedule
 +
   * Monitoring of implementation\\   * Monitoring of implementation\\
 \\ \\
planning/refurbishment_with_passive_house_components/thermal_envelope/airtightness.txt · Last modified: 2022/02/15 19:37 by admin