planning:refurbishment_with_passive_house_components:step-by-step_deep_retrofit_and_building_integrated_facade_roof_on_a_million_program_house

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
planning:refurbishment_with_passive_house_components:step-by-step_deep_retrofit_and_building_integrated_facade_roof_on_a_million_program_house [2019/02/21 12:55] cblagojevicplanning:refurbishment_with_passive_house_components:step-by-step_deep_retrofit_and_building_integrated_facade_roof_on_a_million_program_house [2020/08/14 00:14] – [2.2 Steps] wfeist
Line 44: Line 44:
 The treated floor area (TFA) is measured according to PHPP regulations, and the pressure test result is estimated (since the windows were replaced 27 years ago and the building envelope is generally relatively airtight) (Figure 2). The treated floor area (TFA) is measured according to PHPP regulations, and the pressure test result is estimated (since the windows were replaced 27 years ago and the building envelope is generally relatively airtight) (Figure 2).
  
-[{{:picopen:fig_2_deep.png?600|Figure 2: PHPP results before start of renovation}}]+[{{:picopen:fig_2_deep.png?direct|Figure 2: PHPP results before start of renovation}}]
  
 ==== 2.2.2 Steps 1 and 2 ==== ==== 2.2.2 Steps 1 and 2 ====
planning/refurbishment_with_passive_house_components/step-by-step_deep_retrofit_and_building_integrated_facade_roof_on_a_million_program_house.txt · Last modified: 2020/08/14 00:17 by wfeist