planning:refurbishment_with_passive_house_components:step-by-step_deep_retrofit_and_building_integrated_facade_roof_on_a_million_program_house [2019/02/21 12:55] – cblagojevic | planning:refurbishment_with_passive_house_components:step-by-step_deep_retrofit_and_building_integrated_facade_roof_on_a_million_program_house [2020/08/14 00:14] – [2.2 Steps] wfeist | ||
---|---|---|---|
Line 44: | Line 44: | ||
The treated floor area (TFA) is measured according to PHPP regulations, | The treated floor area (TFA) is measured according to PHPP regulations, | ||
- | [{{: | + | [{{: |
==== 2.2.2 Steps 1 and 2 ==== | ==== 2.2.2 Steps 1 and 2 ==== |