planning:refurbishment_with_passive_house_components:step-by-step_deep_retrofit_and_building_integrated_facade_roof_on_a_million_program_house [2016/09/28 15:04] francis.bosenick@passiv.deplanning:refurbishment_with_passive_house_components:step-by-step_deep_retrofit_and_building_integrated_facade_roof_on_a_million_program_house [2019/02/21 12:55] cblagojevic
Line 21: Line 21:
  
   * Demonstrate a complete cost-effective technique for step-by-step retrofitting ‘million program’ buildings to Passive House Standard with external insulation and a new façade and roof both with BIPV.    * Demonstrate a complete cost-effective technique for step-by-step retrofitting ‘million program’ buildings to Passive House Standard with external insulation and a new façade and roof both with BIPV. 
 +
   * Provide evidence that such a system on similar multi-family buildings can produce 100 % of the building’s net electricity use.    * Provide evidence that such a system on similar multi-family buildings can produce 100 % of the building’s net electricity use. 
 +
   * Reduce space heating demand to below 15 kWh/(m2a) (i.e. to international Passive House Standard) and electricity consumption to approximately 30 kWh/(m2a).    * Reduce space heating demand to below 15 kWh/(m2a) (i.e. to international Passive House Standard) and electricity consumption to approximately 30 kWh/(m2a). 
 +
   * Achieve a highly comfortable indoor climate with good air qualities and comfortable surface temperatures with a low risks for mould while retaining the same indoor temperature.   * Achieve a highly comfortable indoor climate with good air qualities and comfortable surface temperatures with a low risks for mould while retaining the same indoor temperature.
  