planning:refurbishment_with_passive_house_components:airtightness:step-by-step_retrofit_-_airtightness_concept

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
planning:refurbishment_with_passive_house_components:airtightness:step-by-step_retrofit_-_airtightness_concept [2015/06/15 15:17] kdreimaneplanning:refurbishment_with_passive_house_components:airtightness:step-by-step_retrofit_-_airtightness_concept [2015/08/04 18:05] (current) kdreimane
Line 1: Line 1:
 \\ \\
 ====== Step-by-step retrofit: Airtightness concept ====== ====== Step-by-step retrofit: Airtightness concept ======
- + {{:picopen:iee_.png?nolink |}} [[http://europhit.eu|{{:picopen:europhit_logo.png?nolink}}]] \\ \\
-{{:picopen:newco-funded-iee-horiz.jpg?250}} [[http://europhit.eu|{{:picopen:europhit_logo_122x46.png?150}}]] \\ \\+
  
 **Author: Soeren Peper**  **Author: Soeren Peper** 
Line 83: Line 82:
 Using this example case and the results of the airtightness measurements and leak detection, the need for a comprehensive concept for airtightness is clearly evident.  This must be prepared at the start, before any of the modernisation measures. For this, it is necessary to have a detailed record of the current state of all relevant points, and the exact position of the airtight layer must then be specified in the concept (sketch). Finally a solution must be developed for all connections and transitions, using a detail drawing if necessary, and the materials to be used for these points and connections must be specified. Using this example case and the results of the airtightness measurements and leak detection, the need for a comprehensive concept for airtightness is clearly evident.  This must be prepared at the start, before any of the modernisation measures. For this, it is necessary to have a detailed record of the current state of all relevant points, and the exact position of the airtight layer must then be specified in the concept (sketch). Finally a solution must be developed for all connections and transitions, using a detail drawing if necessary, and the materials to be used for these points and connections must be specified.
  
-{{ :picopen:procedure_for_implementing.png |Figure 14: Procedure for implementing a successful airtightness concept in modernisation projects. Photo © Passive House Institute }}+[{{ :picopen:procedure_for_implementing.png |Figure 14: Procedure for implementing a successful airtightness concept in modernisation projects. Photo © Passive House Institute }}]
 \\ \\
  
Line 92: Line 91:
  
 |[Feist/Peper 2005]|Feist, W; Peper, S.: 3-D-Luftdichte Anschlüsse. (3-D Airtight Connections) Passive House Institute, Darmstadt, 2005. Not published.| |[Feist/Peper 2005]|Feist, W; Peper, S.: 3-D-Luftdichte Anschlüsse. (3-D Airtight Connections) Passive House Institute, Darmstadt, 2005. Not published.|
-|[Kaufmann et al. 2009]|Berthold Kaufmann; Søren Peper; Rainer Pfluger; Wolfgang Feist: Sanierung mit Passivhaus-Komponenten, Planungsbegleitende Beratung und Qualitätssicherung Tevesstraße Frankfurt a.M., Bericht im Auftrag des Hessischen Ministeriums für Wirtschaft, Verkehr und Landesentwicklung, Wiesbaden, Passivhaus Institut, Darmstadt, 2009. Download unter: www.passiv.de\\ //Refurbishment using Passive House components, consultation during planning and quality assurance for the Tevesstrasse Project in Frankfurt, Report commissioned by the Ministry of Economy, Transport and Regional Development of the German State of Hesse, Wiesbaden, Passive house Institute, Darmstadt 2009//|+|[Kaufmann et al. 2009]|Berthold Kaufmann; Søren Peper; Rainer Pfluger; Wolfgang Feist: Sanierung mit Passivhaus-Komponenten, Planungsbegleitende Beratung und Qualitätssicherung Tevesstraße Frankfurt a.M., Bericht im Auftrag des Hessischen Ministeriums für Wirtschaft, Verkehr und Landesentwicklung, Wiesbaden, Passivhaus Institut, Darmstadt, 2009. Download unter: www.passiv.de\\ //Refurbishment using Passive House components, consultation during planning and quality assurance for the Tevesstrasse Project in Frankfurt, Report commissioned by the Ministry of Economy, Transport and Regional Development of the German State of Hessen, Wiesbaden, Passive house Institute, Darmstadt 2009//|
 |[Peper/Feist/Sariri 1999]|Peper, S., Feist, W.: Luftdichte Projektierung von Passivhäusern, CEPHEUS-Projektinformation Nr. 7, Passivhaus Institut, Darmstadt, 1999; Fachinformation PHI-1999/6, 10. Auflage Oktober 2009.\\ //Airtight planning of Passive Houses, CEPHEUS Project Information No. 7, Passive House Institute, Darmstadt 1999; Technical Information PHI-1999/6, 10th edition, October 2009//| |[Peper/Feist/Sariri 1999]|Peper, S., Feist, W.: Luftdichte Projektierung von Passivhäusern, CEPHEUS-Projektinformation Nr. 7, Passivhaus Institut, Darmstadt, 1999; Fachinformation PHI-1999/6, 10. Auflage Oktober 2009.\\ //Airtight planning of Passive Houses, CEPHEUS Project Information No. 7, Passive House Institute, Darmstadt 1999; Technical Information PHI-1999/6, 10th edition, October 2009//|
 \\ \\