planning:non-residential_passive_house_buildings
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
planning:non-residential_passive_house_buildings [2023/11/15 10:43] – yaling.hsiao@passiv.de | planning:non-residential_passive_house_buildings [2023/11/15 11:02] – yaling.hsiao@passiv.de | ||
---|---|---|---|
Line 18: | Line 18: | ||
[{{: | [{{: | ||
- | The Passive House primary school and day nursery in Riedberg Frankfurt a.M. was opened in November 2004 after a construction period of only 14 months. The extra costs for achieving the Passive House Standard were a moderate 5.3 % in comparison with the currently valid EnEV (German energy saving regulations) standard. [[: | + | The Passive House primary school and day nursery in Riedberg Frankfurt a.M. was opened in November 2004 after a construction period of only 14 months. The extra costs for achieving the Passive House Standard were a moderate 5.3 % in comparison with the currently valid EnEV (German energy saving regulations) standard. [[: |
- | Besides great environmental benefits like saving 90 % in heating costs and saving 530 tons of CO< | + | Besides great environmental benefits like saving 90 % in heating costs and saving 530 tons of CO< |
---- | ---- |
planning/non-residential_passive_house_buildings.txt · Last modified: 2024/04/19 10:52 by jgrovesmith