examples:residential_buildings:single_-_family_houses:central_europe:the_world_s_first_passive_house_darmstadt-kranichstein_germany
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionLast revisionBoth sides next revision | ||
examples:residential_buildings:single_-_family_houses:central_europe:the_world_s_first_passive_house_darmstadt-kranichstein_germany [2015/09/16 00:40] – [Ventilation] wfeist | examples:residential_buildings:single_-_family_houses:central_europe:the_world_s_first_passive_house_darmstadt-kranichstein_germany [2015/09/20 20:10] – [Conclusion] wfeist | ||
---|---|---|---|
Line 81: | Line 81: | ||
* At the highest setting, between 160 and 185 m³/h are supplied. | * At the highest setting, between 160 and 185 m³/h are supplied. | ||
- | Exhaust | + | Extract |
- | * heat recovery efficiency of over 80%, | + | * heat recovery efficiency of more than 80%, |
* electricity consumption of less than 0.4 Wh/m³ transferred air - see the certified units at [[http:// | * electricity consumption of less than 0.4 Wh/m³ transferred air - see the certified units at [[http:// | ||
Line 91: | Line 91: | ||
The Passive House in Kranichstein was finished in October 1991 and has been inhabited by four families since then. The interior finish materials were selected to create as little indoor air pollution as possible. The insulating materials are airtightly separated from the interior by continuous interior plaster or vapour retarders without any gaps – as appropriate from a building physics perspective. The good air quality was confirmed by a separate investigation within the context of a social science study, which objectified user acceptance [[examples: | The Passive House in Kranichstein was finished in October 1991 and has been inhabited by four families since then. The interior finish materials were selected to create as little indoor air pollution as possible. The insulating materials are airtightly separated from the interior by continuous interior plaster or vapour retarders without any gaps – as appropriate from a building physics perspective. The good air quality was confirmed by a separate investigation within the context of a social science study, which objectified user acceptance [[examples: | ||
- | Due to particularly well-insulating and airtight sliding shutters as temporary heat protection, it was even possible to operate one of the accommodation units as a " | + | Due to particularly well-insulating and airtight sliding shutters as temporary heat protection, it was even possible to operate one of the accommodation units as a " |
\\ | \\ | ||
|{{ : | |{{ : | ||
Line 179: | Line 179: | ||
===== Conclusion ===== | ===== Conclusion ===== | ||
- | It is pleasing that many architects, planners, product developers and property developers have applied the Passive House concept. If we can continue together to accelerate its implementation and apply our experiences for the refurbishment of existing buildings as well, then we will be able to master the task of climate protection and contribute to a fairer distribution of energy globally, as well as increase value creation in regions and thus create additional employment opportunities – and most importantly – enabling people to live a comfortable and worthwhile life in prosperity, today and in the future. Sustainable growth is possible with the Passive House - as Mark Zimmermann outlined in detail at the 9th Passive House Conference in 2005 in Ludwigshafen ([[examples: | + | It is pleasing that many architects, planners, product developers and property developers have applied the Passive House concept |
\\ | \\ | ||
|{{ : | |{{ : | ||
|// | |// | ||
\\ | \\ | ||
- | Scientists, architects, engineers and other contributors from various disciplines played a part in making the Passive House in Darmstadt-Kranichstein a success. The author would like to express thanks to all those involved. The preparation of the experimental construction was based on the results of many forerunner projects and on findings from building physics, building engineering and systematic computer-assisted systems analysis.\\ | + | Scientists, architects, engineers and other contributors from various disciplines played a part in making the Passive House in Darmstadt-Kranichstein a success. The author would like to express thanks to all those involved. The preparation of the experimental construction was based on the results of many [[basics: |
\\ | \\ | ||