examples:non-residential_buildings:passive_house_kindergartens:central_europe:lengdorf_nursery_school_germany

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
examples:non-residential_buildings:passive_house_kindergartens:central_europe:lengdorf_nursery_school_germany [2010/12/03 12:23] beatriceexamples:non-residential_buildings:passive_house_kindergartens:central_europe:lengdorf_nursery_school_germany [2014/09/18 18:19] – external edit 127.0.0.1
Line 1: Line 1:
 +====== Lengdorf nursery school, Germany ======
 +\\
 +|   **Passive House nursery school\\ Passive House according to PHPP calculations (PHI Darmstadt)**\\ \\ See ID 1308 in the [[http://www.passivhausprojekte.de/projekte.php|Passive House project database]]\\ \\ Specific space heating demand: //**15 kWh/(m²yr)**//\\ Primary energy demand: //**80 kWh/(m²yr)**//\\ Primary Effective Floor Area: //**190 m²**//\\ Effective Floor Area: //**325 m²**//\\ Treated Floor Area: //**290 m²**//\\ Volume: //**1,096 m³**//\\ \\ Construction costs: //**1,890€/m² of Effective Floor Area, incl. VAT**//   |{{ :picopen:lengdorf_nursery_roof.jpg?300 }}|
 +\\
 +\\
 +|{{ :picopen:lengdorf_nursery_cross_section.jpg?500 }}|{{ :picopen:lengdorf_nursery_ground_floor.jpg?480 }}|
 +|//**Lengdorf nursery cross section; AB Vallentin**//|//**Lengdorf nursery ground floor; AB Vallentin**//|\\
 +\\
 +**Construction:**
 +  * //**External wall:**// Plasterboard, OSB, plywood I-beams with 40cm cellulose insulation, MDF, ventilated larch sheathing
 +  * //**Roof:**// OSB, plywood I-beams with 40cm cellulose insulation, MDF (open to diffusion), ventilated corrugated aluminium sheet
 +  * //**Floor slab Basement:**// 12cm perimeter insulation, reinforced concrete floor slab, airtight seal, 18cm insulation
 +  * //**Ground floor:**// Impact sound insulation, floor screed, linoleum
 +  * //**Ventilation, heating, DHW:**// Supply&exhaust air system with cross-flow heat exchanger, pre-heating/cooling via groundwater heat exchanger, pellet boiler, 7 m² flat plate collector, 500 litre thermally layered storage tank\\
 +\\
 +|{{ :picopen:lengdorf_nursery_backyard.jpg?500 }}|{{ :picopen:lengdorf_nursery_front.jpg?371 }}|
 +|//**Backyard of the nursery; AB Vallentin**//|//**Front of the nursery; AB Vallentin**//|\\
 +\\
 +|{{ :picopen:lengdorf_nursery_classroom.jpg?500 }}|{{ :picopen:lengdorf_nursery_hallway.jpg?210 }}|
 +|//**A classroom in the nursery; AB Vallentin**//|//**Hallway; AB Vallentin**//|\\
 +\\
 +--------
 +**Architects:**\\
 +Anna Kragler | Florian Baubin | Dieter Focke,\\
 +[[http://www.vallentin-architektur.de/index.htm|AB Vallentin]]\\
 +84405 Dorfen, Germany\\
 +[[info@vallentin-architektur.de]]\\
 +\\
 +**Building services:**\\
 +[[http://www.itg-landshut.de/|IB ITG]],\\
 +84028 Landshut, Germany\\
 +\\
 +**Statics:**\\
 +IB Jochum,\\
 +82239 Alling, Germany\\
 +\\
 +**Outdoor facilities:**\\
 +[[http://www.vallentin-architektur.de/index.htm|AB Vallentin]],\\
 +84405 Dorfen, Germany
  
examples/non-residential_buildings/passive_house_kindergartens/central_europe/lengdorf_nursery_school_germany.txt · Last modified: 2019/03/26 12:12 by cblagojevic