User Tools

Site Tools


construction:quality_assurance:nuremberg_case_study

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
construction:quality_assurance:nuremberg_case_study [2020/08/12 18:44] – [Introduction] wfeistconstruction:quality_assurance:nuremberg_case_study [2020/08/12 18:45] – [Introduction] wfeist
Line 3: Line 3:
 ===== Introduction ===== ===== Introduction =====
  
-=== Demonstration project [[phi_publications:pb_24:modernising_a_block_of_flats_jean-paul-place_4_nuremberg|Nuremberg, Jean-Paul-Platz 4": Modernisation using Passive House Components]] ===+=== Demonstration project [[phi_publications:pb_24:modernising_a_block_of_flats_jean-paul-place_4_nuremberg|modernising a block of flats in Nuremberg]] ===
  
  
construction/quality_assurance/nuremberg_case_study.txt · Last modified: 2020/08/12 18:46 by wfeist