User Tools

Site Tools


planning

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
planning [2020/08/03 10:41] – [Planning and Construction] wfeistplanning [2022/01/21 19:55] wfeist
Line 1: Line 1:
 ====== Planning and Construction ====== ====== Planning and Construction ======
 +
  
  
Line 11: Line 12:
  
 \\ \\
-**When planning a Passive House, all components are important:**+**When planning a Passive House, these components are important:**
   * [[planning:thermal_protection:integrated_thermal_protection|Thermal insulation]]   * [[planning:thermal_protection:integrated_thermal_protection|Thermal insulation]]
   * [[planning:building_services|Building services]]   * [[planning:building_services|Building services]]
Line 30: Line 31:
  
 \\ \\
-**Information about Passive Houses using active cooling techniques in hot or hot and humid climates (suitable for climates in which passive cooling can not guarantee to give a comfortable inddor climate; e.g. if temperatures are above ~22°C all night or if there is high humidity):**+**Information about Passive Houses using active cooling techniques in hot or hot and humid climates (suitable for climates in which passive cooling can not guarantee to give a comfortable indoor climate; e.g. if temperatures are above ~ 22°C all night or if there is high humidity:**
   * [[planning:calculating_energy_efficiency:phpp_-_the_passive_house_planning_package:calculations in hot and humid climates|PHPP calculations in hot and humid climates]]    * [[planning:calculating_energy_efficiency:phpp_-_the_passive_house_planning_package:calculations in hot and humid climates|PHPP calculations in hot and humid climates]] 
  
planning.txt · Last modified: 2023/08/10 12:02 by yaling.hsiao@passiv.de