planning
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
planning [2017/07/06 14:06] – katrin.kraemer@passiv.de | planning [2020/01/09 10:56] – cblagojevic | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Planning ====== | + | ====== Planning |
- | |{{ : | + | [{{ : |
\\ | \\ | ||
- | This section contains information about the following topics: | + | **This section contains information about the following topics:** |
* [[planning: | * [[planning: | ||
- | |||
- | |||
- | |||
* [[planning: | * [[planning: | ||
- | + | | |
- | + | ||
- | + | ||
- | | + | |
- | + | ||
* [[planning: | * [[planning: | ||
\\ | \\ | ||
- | When planning a Passive House, all components are important: | + | **When planning a Passive House, all components are important:** |
* [[planning: | * [[planning: | ||
* [[planning: | * [[planning: | ||
Line 26: | Line 17: | ||
\\ | \\ | ||
- | The definition of the term " | + | **The definition of the term " |
* [[basics: | * [[basics: | ||
* [[basics: | * [[basics: | ||
Line 32: | Line 23: | ||
* [[planning: | * [[planning: | ||
\\ | \\ | ||
- | The Passive House Institute provides several tools: | + | **The Passive House Institute provides several tools:** |
* [[planning: | * [[planning: | ||
\\ | \\ | ||
- | + | **Information about Passive Houses in summer can be found here:** | |
- | Information about Passive Houses in summer can be found here: | + | |
* [[basics: | * [[basics: | ||
\\ | \\ | ||
- | Through the refurbishing of buildings, significant energy savings can be made: | + | **Through the refurbishing of buildings, significant energy savings can be made:** |
* [[planning: | * [[planning: | ||
\\ | \\ | ||
- | The number of non-residential Passive Houses with special user-based requirements is increasing: | + | ** |
+ | The number of non-residential and residential Passive Houses with special user-based requirements is increasing:** | ||
* [[planning: | * [[planning: | ||
+ | * [[basics: | ||
\\ | \\ | ||
+ | **Information about planning Passive Houses in different climates:** | ||
+ | * [[basics: | ||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | ====== Quality Assurance ====== | ||
+ | |||
+ | This section compiles the main tasks regarding quality assurance in the course of site supervision, | ||
+ | |||
+ | Special aspects of quality assurance are presented in the following sections.\\ | ||
+ | |||
+ | * [[construction: | ||
+ | |||
+ | * [[construction: | ||
+ | |||
+ | * [[construction: | ||
+ | |||
+ | * [[construction: | ||
+ | |||
+ | |||
+ | \\ | ||
+ | |||
+ | ===== See also ===== | ||
+ | |||
+ | * [[planning: | ||
+ | * [[construction: | ||
- | Information about planning Passive Houses in different climates: | ||
- | * [[basics: | ||
- | [[planning: |
planning.txt · Last modified: 2023/08/10 12:02 by yaling.hsiao@passiv.de