planning
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| planning [2014/08/08 13:27] – cweber | planning [2023/08/10 12:02] (current) – [See also] yaling.hsiao@passiv.de | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | ====== Planning and Construction ====== | ||
| + | |||
| + | [{{ : | ||
| + | \\ | ||
| + | The [[: | ||
| + | |||
| + | \\ | ||
| + | **This section contains information about the following topics:** | ||
| + | |||
| + | * [[: | ||
| + | * [[: | ||
| + | * [[: | ||
| + | * [[: | ||
| + | |||
| + | \\ **When planning a Passive House, these components are important: | ||
| + | |||
| + | * [[: | ||
| + | * [[: | ||
| + | * [[: | ||
| + | |||
| + | \\ **The definition of the term " | ||
| + | |||
| + | * [[: | ||
| + | * [[: | ||
| + | * [[http:// | ||
| + | * [[: | ||
| + | |||
| + | \\ **The Passive House Institute provides several tools:** | ||
| + | |||
| + | * [[: | ||
| + | |||
| + | \\ **Information about Passive Houses using passive cooling techniques in summer can be found here (suitable for climates in which night temperatures keep being low (<18°C) even in hot periods; e.g. Central and Northern Europe):** | ||
| + | |||
| + | * [[: | ||
| + | |||
| + | \\ **Information about Passive Houses using active cooling techniques in hot or hot and humid climates (suitable for climates in which passive cooling can not guarantee to give a comfortable indoor climate; e.g. if temperatures are above ~ 22°C all night or if there is high humidity:** | ||
| + | |||
| + | * [[: | ||
| + | |||
| + | \\ **Through the refurbishing of buildings, significant energy savings can be made:** | ||
| + | |||
| + | * [[: | ||
| + | |||
| + | \\ **The number of non-residential and residential Passive Houses with special user-based requirements is increasing: | ||
| + | |||
| + | * [[: | ||
| + | * [[: | ||
| + | |||
| + | \\ **Information about planning Passive Houses in different climates:** | ||
| + | |||
| + | * [[: | ||
| + | |||
| + | ---- | ||
| + | |||
| + | ====== Quality Assurance ====== | ||
| + | |||
| + | This section compiles the main tasks regarding quality assurance in the course of site supervision, | ||
| + | |||
| + | Special aspects of quality assurance are presented in the following sections. | ||
| + | |||
| + | * [[: | ||
| + | |||
| + | * [[: | ||
| + | |||
| + | * [[: | ||
| + | |||
| + | * [[: | ||
| + | |||
| + | ===== See also ===== | ||
| + | |||
| + | * [[: | ||
| + | * [[: | ||
| + | * [[: | ||
| + | |||
