User Tools

Site Tools


planning

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
planning [2018/06/15 09:41] cblagojevicplanning [2020/08/03 10:31] – [Planning and Construction] wfeist
Line 26: Line 26:
   * [[planning:Tools|]]   * [[planning:Tools|]]
 \\ \\
-**Information about Passive Houses in summer can be found here:**+**Information about Passive Houses using passive cooling techniques in summer can be found here (suitable for climates in which night temperatures keep being low (<18°C) even in hot periods; i.a. Central and Northern Europe):**
   * [[basics:summer|]]   * [[basics:summer|]]
 \\ \\
Line 32: Line 32:
   * [[planning:refurbishment_with_passive_house_components]]   * [[planning:refurbishment_with_passive_house_components]]
 \\ \\
-**The number of non-residential Passive Houses with special user-based requirements is increasing:**+** 
 +The number of non-residential and residential Passive Houses with special user-based requirements is increasing:**
   * [[planning:non-residential_passive_house_buildings]]   * [[planning:non-residential_passive_house_buildings]]
 +  * [[basics:passive_house_-_assuring_a_sustainable_energy_supply:Renewable primary energy demand in residential buildings]]
 \\ \\
 **Information about planning Passive Houses in different climates:** **Information about planning Passive Houses in different climates:**
Line 47: Line 49:
 Special aspects of quality assurance are presented in the following sections.\\ Special aspects of quality assurance are presented in the following sections.\\
  
-  * [[construction:quality assurance:Airtightness and wind proofing|Airtightness and wind proofing]]\\+  * [[construction:quality assurance:Airtightness and wind proofing|Airtightness and wind proofing]]  {{:picopen:members_only.png?25|}}\\
  
-  * [[construction:quality assurance:Thermal bridges|Thermal bridges]]\\+  * [[construction:quality assurance:Thermal bridges|Thermal bridges]]  {{:picopen:members_only.png?25|}}\\
  
-  * [[construction:quality assurance:Final approval and initial use|Final approval and initial use]]\\+  * [[construction:quality assurance:Final approval and initial use|Final approval and initial use]]  {{:picopen:members_only.png?25|}}\\
  
   * [[construction:quality assurance:Nuremberg case study]]   * [[construction:quality assurance:Nuremberg case study]]
Line 61: Line 63:
  
   * [[planning:airtight_construction:general_principles:blower_door_test|Blowerdoor Test]]   * [[planning:airtight_construction:general_principles:blower_door_test|Blowerdoor Test]]
-  * Thermographic imaging +  * [[construction:quality_assurance:nuremberg_case_study:examination_of_the_external_envelope_using_thermographic_imaging|Thermographic imaging]] 
-  * Dry construction! + 
-  * Keeping ventilation components clean+
  
planning.txt · Last modified: 2023/08/10 12:02 by yaling.hsiao@passiv.de