planning:thermal_protection:windows:editing_passive_house_windows_tender_specifications:start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
planning:thermal_protection:windows:editing_passive_house_windows_tender_specifications:start [2015/07/03 15:36] – alang | planning:thermal_protection:windows:editing_passive_house_windows_tender_specifications:start [2015/08/07 07:32] (current) – kdreimane | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | {{: | ||
+ | |||
===== Passive House windows tender specifications ===== | ===== Passive House windows tender specifications ===== | ||
Line 14: | Line 16: | ||
**1. Tender specification for PH windows as a product to be delivered: | **1. Tender specification for PH windows as a product to be delivered: | ||
- | **2. Tender specification for PH window fixing and installation: | + | **2. Tender specification for PH window fixing and installation: |
+ | \\ | ||
+ | |//The sole responsibility for the content of Passipedia lies with the authors. \\ While certain marked articles have been created with the support of the EU, they do not necessarily reflect the opinion of the European Union; \\ Neither the EACI nor the European Commission are responsible for any use that may be made of the information contained therein.//| \\ | ||
+ | \\ | ||
planning/thermal_protection/windows/editing_passive_house_windows_tender_specifications/start.1435930605.txt.gz · Last modified: 2015/07/03 15:36 by alang