planning:thermal_bridge_tool
Differences
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
planning:thermal_bridge_tool [2021/09/02 11:54] – created nsukhija | planning:thermal_bridge_tool [2021/09/27 09:34] (current) – nsukhija | ||
---|---|---|---|
Line 5: | Line 5: | ||
Typical details of a retrofit project are calculated for insulation thicknesses increasing in 25mm steps, starting with 0mm of insulation (usually the existing building) up to 400mm of insulation. These steps of insulation thicknesses were applied to two construction types, brick wall and concrete wall constructions. Also the conductivity value of the insulation layer was modified assuming 0.025 W/(mK), 0.035 W/(mK) and 0.045 W/(mK). | Typical details of a retrofit project are calculated for insulation thicknesses increasing in 25mm steps, starting with 0mm of insulation (usually the existing building) up to 400mm of insulation. These steps of insulation thicknesses were applied to two construction types, brick wall and concrete wall constructions. Also the conductivity value of the insulation layer was modified assuming 0.025 W/(mK), 0.035 W/(mK) and 0.045 W/(mK). | ||
- | Thank to interpolations, | + | Thank to interpolations, |
All shown thermal bridges can also be found in the [[basics: | All shown thermal bridges can also be found in the [[basics: | ||
Line 25: | Line 25: | ||
Unzip the ZIP file. If you do not have a programme for processing ZIP files, you may download a free test version of the WinZip programme from www.winzip.com. | Unzip the ZIP file. If you do not have a programme for processing ZIP files, you may download a free test version of the WinZip programme from www.winzip.com. | ||
- | Click [[:playground: | + | Click [[:planning: |
planning/thermal_bridge_tool.1630576461.txt.gz · Last modified: 2021/09/02 11:54 by nsukhija