Line 113: | Line 113: | ||
Besides the basic principles, the following guidelines are helpful for successful planning of the airtightness – whether for a new construction or for a refurbishment of an old building (based on [[planning: | Besides the basic principles, the following guidelines are helpful for successful planning of the airtightness – whether for a new construction or for a refurbishment of an old building (based on [[planning: | ||
* **simplicity**: | * **simplicity**: | ||
+ | |||
* preferably **large uniform** areas with a simple basic construction | * preferably **large uniform** areas with a simple basic construction | ||
+ | |||
* selection of reliable and proven basic construction techniques – it is not necessary to develop completely new or exceptional sealing systems | * selection of reliable and proven basic construction techniques – it is not necessary to develop completely new or exceptional sealing systems | ||
+ | |||
* **adherence to common principles** when planning different connections | * **adherence to common principles** when planning different connections | ||
+ | |||
* in principle, any **penetrations** of the sealing envelope should be avoided or minimised\\ | * in principle, any **penetrations** of the sealing envelope should be avoided or minimised\\ | ||
\\ | \\ | ||
Line 177: | Line 181: | ||
Therefore, in new constructions as well as in modernisations, | Therefore, in new constructions as well as in modernisations, | ||
* Preliminary planning | * Preliminary planning | ||
+ | |||
* Coordination of the trades (order) | * Coordination of the trades (order) | ||
+ | |||
* Time schedule | * Time schedule | ||
+ | |||
* Monitoring of implementation\\ | * Monitoring of implementation\\ | ||
\\ | \\ |
planning/refurbishment_with_passive_house_components/thermal_envelope/airtightness.txt · Last modified: 2022/02/15 19:37 by admin