planning:refurbishment_with_passive_house_components:airtightness:step-by-step_retrofit_-_airtightness_concept [2015/06/15 16:52] – [Recommendations for the airtightness concept] kdreimaneplanning:refurbishment_with_passive_house_components:airtightness:step-by-step_retrofit_-_airtightness_concept [2015/08/04 18:05] (current) kdreimane
Line 1: Line 1:
 \\ \\
 ====== Step-by-step retrofit: Airtightness concept ====== ====== Step-by-step retrofit: Airtightness concept ======
- + {{:picopen:iee_.png?nolink |}} [[http://europhit.eu|{{:picopen:europhit_logo.png?nolink}}]] \\ \\
-{{:picopen:newco-funded-iee-horiz.jpg?250}} [[http://europhit.eu|{{:picopen:europhit_logo_122x46.png?150}}]] \\ \\+
  
 **Author: Soeren Peper**  **Author: Soeren Peper** 
Line 83: Line 82:
 Using this example case and the results of the airtightness measurements and leak detection, the need for a comprehensive concept for airtightness is clearly evident.  This must be prepared at the start, before any of the modernisation measures. For this, it is necessary to have a detailed record of the current state of all relevant points, and the exact position of the airtight layer must then be specified in the concept (sketch). Finally a solution must be developed for all connections and transitions, using a detail drawing if necessary, and the materials to be used for these points and connections must be specified. Using this example case and the results of the airtightness measurements and leak detection, the need for a comprehensive concept for airtightness is clearly evident.  This must be prepared at the start, before any of the modernisation measures. For this, it is necessary to have a detailed record of the current state of all relevant points, and the exact position of the airtight layer must then be specified in the concept (sketch). Finally a solution must be developed for all connections and transitions, using a detail drawing if necessary, and the materials to be used for these points and connections must be specified.
  
-[{{:picopen:procedure_for_implementing.png |Figure 14: Procedure for implementing a successful airtightness concept in modernisation projects. Photo © Passive House Institute }}+[{{ :picopen:procedure_for_implementing.png |Figure 14: Procedure for implementing a successful airtightness concept in modernisation projects. Photo © Passive House Institute }}]
 \\ \\
  