planning:planning:thermal_protection_and_modernisation_of_existing_buildings [2019/02/28 11:09] – [The EnerPHit Standard] cblagojevic | planning:planning:thermal_protection_and_modernisation_of_existing_buildings [2019/02/28 11:10] (current) – [Overall refurbishment plans for stepwise retrofit approaches] cblagojevic | ||
---|---|---|---|
Line 72: | Line 72: | ||
[{{: | [{{: | ||
- | * Unordered List ItemFirst | + | * First the existing building needs to be analysed, energy consumption, |
- | * Unordered List ItemAs | + | |
- | * Unordered List ItemDescriptions | + | * As a next step, the existing building needs to be entered into the PHPP 9. Then suggested measures can be entered separately as retrofit steps in PHPP 9, as variants to the existing building. The final step will illustrate that the efficiency improvements to be carried out will enable the building to fulfil EnerPHit standard. |
- | * Unordered List ItemAdditionally, it is recommended to follow a checklist for typical considerations with the sequential order (e.g. airtightness before installation of the ventilation system; renewal of the heating system before optimisation of the thermal protection, insulation of the floor before replacement of French windows etc.). | + | |
- | * Unordered List ItemSpecific | + | * Descriptions |
+ | |||
+ | * Additionally, it is recommended to follow a checklist for typical considerations with the sequential order (e.g. airtightness before installation of the ventilation system; renewal of the heating system before optimisation of the thermal protection, insulation of the floor before replacement of French windows etc.). | ||
+ | |||
+ | * Specific | ||
An overall refurbishment plan set up like this allows the building owner to understand the retrofit concept, required component qualities and dependencies of the separate retrofit steps. Just as well, the contractors, | An overall refurbishment plan set up like this allows the building owner to understand the retrofit concept, required component qualities and dependencies of the separate retrofit steps. Just as well, the contractors, |