planning:planning:thermal_protection_and_modernisation_of_existing_buildings
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionLast revisionBoth sides next revision | ||
planning:planning:thermal_protection_and_modernisation_of_existing_buildings [2015/07/02 11:43] – kdreimane | planning:planning:thermal_protection_and_modernisation_of_existing_buildings [2019/02/28 11:09] – [The EnerPHit Standard] cblagojevic | ||
---|---|---|---|
Line 18: | Line 18: | ||
[{{: | [{{: | ||
+ | |||
\\ | \\ | ||
The primary aim of this certification is to provide quality assurance for the refurbishment so that the building owner can be sure that the stipulated optimal standard of thermal protection is actually achieved and that the implemented measures prove to be adequate. This is all the more important because subsequent " | The primary aim of this certification is to provide quality assurance for the refurbishment so that the building owner can be sure that the stipulated optimal standard of thermal protection is actually achieved and that the implemented measures prove to be adequate. This is all the more important because subsequent " | ||
Line 94: | Line 95: | ||
==== Exemplary implementation of pilot projects ==== | ==== Exemplary implementation of pilot projects ==== | ||
[{{: | [{{: | ||
+ | |||
The certification process described above as well as the certification platform have been developed in the European IEE funding project EuroPHit. In this project, practical pilot projects of step-by-step retrofits are carried out to gain practical experiences with the certification process, set up catalogues with exemplary construction details, videos of installation procedures, and guides for modernisation pro-cesses will be developed and made available. In addition, the planning and expert teams involved in these pilot projects will be trained for the specific requirements of step-by-step refurbishment projects. | The certification process described above as well as the certification platform have been developed in the European IEE funding project EuroPHit. In this project, practical pilot projects of step-by-step retrofits are carried out to gain practical experiences with the certification process, set up catalogues with exemplary construction details, videos of installation procedures, and guides for modernisation pro-cesses will be developed and made available. In addition, the planning and expert teams involved in these pilot projects will be trained for the specific requirements of step-by-step refurbishment projects. | ||
Line 108: | Line 110: | ||
\\ | \\ | ||
{{: | {{: | ||
- | The sole responsibility for the content of this [webpage, publication etc.] lies with the authors. | + | \\ |
+ | |//The sole responsibility for the content of Passipedia | ||
+ | \\ | ||
planning/planning/thermal_protection_and_modernisation_of_existing_buildings.txt · Last modified: 2019/02/28 11:10 by cblagojevic