planning:planning:thermal_protection_and_modernisation_of_existing_buildings [2015/07/01 09:07] – [New certification concept for step-by-step retrofits] kdreimaneplanning:planning:thermal_protection_and_modernisation_of_existing_buildings [2015/08/07 07:34] – [Exemplary implementation of pilot projects] kdreimane
Line 2: Line 2:
  
 {{:picopen:newco-funded-iee-horiz.jpg?310}} [[http://www.passreg.eu/|{{:picopen:logo_passreg.png?240}}]] \\ \\  {{:picopen:newco-funded-iee-horiz.jpg?310}} [[http://www.passreg.eu/|{{:picopen:logo_passreg.png?240}}]] \\ \\ 
 +
 +Author: Jan Steiger
 +\\
  
 ====== Thermal protection and modernisation of existing buildings ====== ====== Thermal protection and modernisation of existing buildings ======
Line 64: Line 67:
 \\ \\
 \\ \\
-\\  
  
 ==== Overall refurbishment plans for stepwise retrofit approaches ==== ==== Overall refurbishment plans for stepwise retrofit approaches ====
Line 86: Line 88:
 Following this concept, it is guaranteed that a retrofit plan started can be carried out according to the highly ambitious concept that was foreseen from the start, even over a bigger time span of many years. Thereby, even in case of the change of the building owner, the consultant or contractors, the basic concept and requirements for the deep retrofit approach are always comprehensive and available. To allow a continuous work-flow for long time retrofit processes, the certification scheme also offers to store the relevant document such as plan materials, details, component datasheets or PHPP calculation on a Certification Platform, that supports a streamlined certification process and documentation over many years. Following this concept, it is guaranteed that a retrofit plan started can be carried out according to the highly ambitious concept that was foreseen from the start, even over a bigger time span of many years. Thereby, even in case of the change of the building owner, the consultant or contractors, the basic concept and requirements for the deep retrofit approach are always comprehensive and available. To allow a continuous work-flow for long time retrofit processes, the certification scheme also offers to store the relevant document such as plan materials, details, component datasheets or PHPP calculation on a Certification Platform, that supports a streamlined certification process and documentation over many years.
 \\  \\ 
-\\ 
-\\ 
 \\ \\
 \\ \\
Line 94: Line 94:
 ==== Exemplary implementation of pilot projects ==== ==== Exemplary implementation of pilot projects ====
 [{{:picopen:case_study_projects_illustrating_step-by-step_approaches.png?500 |**Figure 7: case study projects illustrating step-by-step approaches**}}] [{{:picopen:case_study_projects_illustrating_step-by-step_approaches.png?500 |**Figure 7: case study projects illustrating step-by-step approaches**}}]
 +
 The certification process described above as well as the certification platform have been developed in the European IEE funding project EuroPHit. In this project, practical pilot projects of step-by-step retrofits are carried out to gain practical experiences with the certification process, set up catalogues with exemplary construction details, videos of installation procedures, and guides for modernisation pro-cesses will be developed and made available. In addition, the planning and expert teams involved in these pilot projects will be trained for the specific requirements of step-by-step refurbishment projects.  The certification process described above as well as the certification platform have been developed in the European IEE funding project EuroPHit. In this project, practical pilot projects of step-by-step retrofits are carried out to gain practical experiences with the certification process, set up catalogues with exemplary construction details, videos of installation procedures, and guides for modernisation pro-cesses will be developed and made available. In addition, the planning and expert teams involved in these pilot projects will be trained for the specific requirements of step-by-step refurbishment projects. 
  
Line 100: Line 101:
 \\ \\
  
-\\+
  
  
Line 108: Line 109:
 \\ \\
 {{:picopen:newco-funded-iee-horiz.jpg?250}} [[http://europhit.eu|{{:picopen:europhit_logo_122x46.png?150}}]] \\ \\ {{:picopen:newco-funded-iee-horiz.jpg?250}} [[http://europhit.eu|{{:picopen:europhit_logo_122x46.png?150}}]] \\ \\
-The sole responsibility for the content of this [webpage, publication etc.] lies with the authors. It doesnot necessarily reflect the opinion of the European UnionNeither the EACI nor the European Commission are responsible for any use that may be made of the information contained therein.+\\ 
 +|//The sole responsibility for the content of Passipedia lies with the authors. While certain marked articles have been created with the support of the EU, they do not necessarily reflect the opinion of the European UnionNeither the EACI nor the European Commission are responsible for any use that may be made of the information contained therein.//| \\ 
 +\\ 
  