planning:planning:thermal_protection_and_modernisation_of_existing_buildings [2019/02/28 11:09] – [The EnerPHit Standard] cblagojevicplanning:planning:thermal_protection_and_modernisation_of_existing_buildings [2019/02/28 11:10] (current) – [Overall refurbishment plans for stepwise retrofit approaches] cblagojevic
Line 72: Line 72:
  
 [{{:picopen:phpp_9_with_data_entry_of_retrofit_steps.png?500 |**Figure 5: PHPP 9 with data entry of retrofit steps**}}] So, instead of retrofitting a single component now and identify problems with following measures later, setting up an overall retrofit plan is the proper way to do it. Even though the initial effort for setting up such a plan, the creation of such a document makes sense, enabling the investor or building owner to have an overview over the efficiency properties of his building, the retrofit requirements and schedule and the reduction potentials for energy consumption and CO2 emissions. [{{:picopen:phpp_9_with_data_entry_of_retrofit_steps.png?500 |**Figure 5: PHPP 9 with data entry of retrofit steps**}}] So, instead of retrofitting a single component now and identify problems with following measures later, setting up an overall retrofit plan is the proper way to do it. Even though the initial effort for setting up such a plan, the creation of such a document makes sense, enabling the investor or building owner to have an overview over the efficiency properties of his building, the retrofit requirements and schedule and the reduction potentials for energy consumption and CO2 emissions.
-  * Unordered List ItemFirst the existing building needs to be analysed, energy consumption, known problems and component life cycles taken into account +  * First the existing building needs to be analysed, energy consumption, known problems and component life cycles taken into account 
-  * Unordered List ItemAs a next step, the existing building needs to be entered into the PHPP 9. Then suggested measures can be entered separately as retrofit steps in PHPP 9, as variants to the existing building. The final step will illustrate that the efficiency improvements to be carried out will enable the building to fulfil EnerPHit standard. + 
-  * Unordered List ItemDescriptions of the retrofit steps and measures needs to be set up and a schematic diagram of the chronological flow of the modernisation steps or set of measures will be created. +  * As a next step, the existing building needs to be entered into the PHPP 9. Then suggested measures can be entered separately as retrofit steps in PHPP 9, as variants to the existing building. The final step will illustrate that the efficiency improvements to be carried out will enable the building to fulfil EnerPHit standard. 
-  * Unordered List ItemAdditionally, it is recommended to follow a checklist for typical considerations with the sequential order (e.g. airtightness before installation of the ventilation system; renewal of the heating system before optimisation of the thermal protection, insulation of the floor before replacement of French windows etc.). + 
-  * Unordered List ItemSpecific connection details between components and spate retrofit steps will need to be roughly be sketched. In these sketches the airtightness-layer needs to be indicated and described.+  * Descriptions of the retrofit steps and measures needs to be set up and a schematic diagram of the chronological flow of the modernisation steps or set of measures will be created. 
 + 
 +  * Additionally, it is recommended to follow a checklist for typical considerations with the sequential order (e.g. airtightness before installation of the ventilation system; renewal of the heating system before optimisation of the thermal protection, insulation of the floor before replacement of French windows etc.). 
 + 
 +  * Specific connection details between components and spate retrofit steps will need to be roughly be sketched. In these sketches the airtightness-layer needs to be indicated and described.
  
  An overall refurbishment plan set up like this allows the building owner to understand the retrofit concept, required component qualities and dependencies of the separate retrofit steps. Just as well, the contractors, who will carry out the retrofit steps have this document as guideline for their work.  An overall refurbishment plan set up like this allows the building owner to understand the retrofit concept, required component qualities and dependencies of the separate retrofit steps. Just as well, the contractors, who will carry out the retrofit steps have this document as guideline for their work.
planning/planning/thermal_protection_and_modernisation_of_existing_buildings.txt · Last modified: 2019/02/28 11:10 by cblagojevic