planning:building_services:heating_and_dhw
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionLast revisionBoth sides next revision | ||
planning:building_services:heating_and_dhw [2018/06/22 11:56] – [Combustion heat in the Passive House] cblagojevic | planning:building_services:heating_and_dhw [2018/06/22 12:20] – [Experience with drain water heat recovery] cblagojevic | ||
---|---|---|---|
Line 23: | Line 23: | ||
[[planning: | [[planning: | ||
- | [[planning: | + | [[planning: |
[[planning: | [[planning: | ||
Line 32: | Line 32: | ||
===== Experience with drain water heat recovery ===== | ===== Experience with drain water heat recovery ===== | ||
Domestic wastewater is generally warmer than 20 °C, while wastewater from hot showers can reach as much as 35 °C. Considering the large amounts of water that need to be processed in buildings and how much water can contribute to heating, it makes perfect sense to use this heat source in some way. | Domestic wastewater is generally warmer than 20 °C, while wastewater from hot showers can reach as much as 35 °C. Considering the large amounts of water that need to be processed in buildings and how much water can contribute to heating, it makes perfect sense to use this heat source in some way. | ||
- | [[planning: | + | [[planning: |
===== Supplying Passive Houses with sustainable energy ===== | ===== Supplying Passive Houses with sustainable energy ===== |
planning/building_services/heating_and_dhw.txt · Last modified: 2018/07/02 10:22 by cblagojevic