planning:airtight_construction:general_principles:blower_door_test
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
planning:airtight_construction:general_principles:blower_door_test [2015/09/14 18:22] – [Background: German legal requirements] wfeist | planning:airtight_construction:general_principles:blower_door_test [2019/01/02 10:28] (current) – [See also] cblagojevic | ||
---|---|---|---|
Line 14: | Line 14: | ||
===== Air pressure test ===== | ===== Air pressure test ===== | ||
- | The **air pressure test**, or the **n< | + | The **air pressure test**, or the **n< |
\\ | \\ | ||
Line 30: | Line 30: | ||
===== The Passive House ===== | ===== The Passive House ===== | ||
- | Much better values are often achieved for Passive Houses: n< | + | Much better values are regularly |
\\ | \\ | ||
|{{ : | |{{ : | ||
Line 36: | Line 36: | ||
and the EnEV requirements. Nowadays, if one wishes to build a\\ | and the EnEV requirements. Nowadays, if one wishes to build a\\ | ||
house, attention should be paid to a high level of airtightness\\ | house, attention should be paid to a high level of airtightness\\ | ||
- | - because trying to improve the airtightness afterwards is very\\ | + | - because trying to improve the airtightness afterwards is much more\\ |
difficult and only possible during the course of a full\\ refurbishment.**// | difficult and only possible during the course of a full\\ refurbishment.**// | ||
Line 43: | Line 43: | ||
[[planning: | [[planning: | ||
+ | |||
+ | [[planning: | ||
planning/airtight_construction/general_principles/blower_door_test.1442247756.txt.gz · Last modified: 2015/09/14 18:22 by wfeist