planning:airtight_construction:airtightness_approaches_for_deep_renovation
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
planning:airtight_construction:airtightness_approaches_for_deep_renovation [2024/09/06 10:23] – yaling.hsiao@passiv.de | planning:airtight_construction:airtightness_approaches_for_deep_renovation [2024/10/30 10:43] (current) – [See also] yaling.hsiao@passiv.de | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Airtightness | + | ====== Airtightness |
Author: Søren Peper | Author: Søren Peper | ||
Line 54: | Line 54: | ||
* Details such as sealing at mechanical supports for the modules as well as cable and pipe penetrations are must also be covered in the design. | * Details such as sealing at mechanical supports for the modules as well as cable and pipe penetrations are must also be covered in the design. | ||
- | ===== Decision | + | ===== Decision |
The following matrix shows the possible ways of ensuring airtightness of the building for the renovation process. | The following matrix shows the possible ways of ensuring airtightness of the building for the renovation process. | ||
Line 63: | Line 63: | ||
**[Peper 2024]** | **[Peper 2024]** | ||
+ | |||
+ | ---- | ||
+ | |||
+ | {{: | ||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
===== See also ===== | ===== See also ===== | ||
Line 70: | Line 78: | ||
[[: | [[: | ||
- | [[: | + | [[planning:refurbishment_with_passive_house_components]] |
+ | |||
+ | [[https:// | ||
- | ---- | ||
- | {{: | ||
planning/airtight_construction/airtightness_approaches_for_deep_renovation.1725611029.txt.gz · Last modified: by yaling.hsiao@passiv.de