User Tools

Site Tools


construction:quality_assurance:nuremberg_case_study

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
construction:quality_assurance:nuremberg_case_study [2018/06/22 12:29] – [See also] cblagojevicconstruction:quality_assurance:nuremberg_case_study [2019/02/21 11:23] cblagojevic
Line 29: Line 29:
 Thermal protection of the connection details yielded excellent results. Inspection using thermographic imaging of the exterior and interior showed that: Thermal protection of the connection details yielded excellent results. Inspection using thermographic imaging of the exterior and interior showed that:
  
-  * The interior surface temperatures were > 15.5°C everywhere; thus mould growth can be ruled out +  * The interior surface temperatures were > 15.5°C everywhere; thus mould growth can be ruled out 
 + 
   * The lowest temperatures are found at the glass edge seal and at the base board of the lower corners of the building. The temperatures at the base are almost one degree less than the calculated temperature. This is due to drying processes taking place in the external wall that is damp from previous years.   * The lowest temperatures are found at the glass edge seal and at the base board of the lower corners of the building. The temperatures at the base are almost one degree less than the calculated temperature. This is due to drying processes taking place in the external wall that is damp from previous years.
  
Line 42: Line 43:
 [[construction:quality_assurance:airtightness_and_wind_proofing|]]  {{:picopen:members_only.png?25|}}\\ [[construction:quality_assurance:airtightness_and_wind_proofing|]]  {{:picopen:members_only.png?25|}}\\
  
-[[construction:quality_assurance:final_approval_and_initial_use|]]\\+[[construction:quality_assurance:final_approval_and_initial_use|]]  {{:picopen:members_only.png?25|}}\\
  
 [[construction:quality_assurance:thermal_bridges|]]  {{:picopen:members_only.png?25|}} [[construction:quality_assurance:thermal_bridges|]]  {{:picopen:members_only.png?25|}}
construction/quality_assurance/nuremberg_case_study.txt · Last modified: 2020/08/12 18:46 by wfeist