User Tools

Site Tools


basics:the_passive_house_-_historical_review

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
basics:the_passive_house_-_historical_review [2019/05/16 08:49] cblagojevicbasics:the_passive_house_-_historical_review [2019/05/22 09:01] – [Working systematically in Germany: Bergmann, Bruno, Hermann, Hörster, Steinmüller, Kersten, Klinkenberg and the Philips Experimental House] cblagojevic
Line 34: Line 34:
 ===== Working systematically in Germany: Bergmann, Bruno, Hermann, Hörster, Steinmüller, Kersten, Klinkenberg and the Philips Experimental House ===== ===== Working systematically in Germany: Bergmann, Bruno, Hermann, Hörster, Steinmüller, Kersten, Klinkenberg and the Philips Experimental House =====
  
-{{:picopen:philips_experimentierhaus.jpg?300 }} <- ** The Philips Experimental House (from: Hörster et al))**\\ \\ Parallel to the Scandinavian and American developments, systematic study of energy-efficient buildings was carried out in Germany by Dr. Horst Hörster (research group leader), Dr. Bernd Steinmüller (building models and simulations), Dr. Günther Bergmann, Dr. Richard Bruno, Dr. Wilhelm Hermann, Dr. Reinhard Kersten, and Ing. Klaus Klinkenberg, with funding provided by the Federal Ministry of Research. A super-insulated experimental house, built in 1974/75, equipped with ground heat exchangers, controlled ventilation, solar and heat pump technology and “inhabited” by a computer, served as a test and calibration laboratory for computer models, used to explore the possibilities of energy efficiency and the use of renewable energy sources. These studies showed the potential for energy savings in the order of 10 to 20 times for Europe and America using passive measures alone, thus proving that such measures are an important step on the way to energy efficient buildings. Dr. Bernd Steinmüller has been engaged in research on efficient buildings since 1997 and continues to be a pioneer, disseminating original ideas worldwide. +{{:picopen:philips_experimentierhaus.jpg?300 }} <- ** The Philips Experimental House (from: Hörster et al))**\\ \\ Parallel to the Scandinavian and American developments, systematic study of energy-efficient buildings was carried out in Germany by Dr. Horst Hörster (research group leader), Dr. Bernd Steinmüller (building models and simulations), Dr. Günther Bergmann, Dr. Richard Bruno, Dr. Wilhelm Hermann, Dr. Reinhard Kersten, and Ing. Klaus Klinkenberg, with funding provided by the Federal Ministry of Research. A super-insulated experimental house, built in 1974/75, equipped with ground heat exchangers, controlled ventilation, solar and heat pump technology and “inhabited” by a computer, served as a test and calibration laboratory for computer models, used to explore the possibilities of energy efficiency and the use of renewable energy sources. These studies showed the potential for energy savings in the order of 10 to 20 times for Europe and America using passive measures alone, thus proving that such measures are an important step on the way to energy efficient buildings. Dr. Bernd Steinmüller has been engaged again in research on efficient buildings since 1997 and continues to be a pioneer, disseminating original ideas worldwide. 
  
 Experiences from this project were incorporated into Passive House research from the very beginning. \\ Experiences from this project were incorporated into Passive House research from the very beginning. \\
basics/the_passive_house_-_historical_review.txt · Last modified: 2022/08/27 19:13 by wfeist