basics:building_physics_-_basics:thermal_bridges:tbcalculation:examples:iwfs

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
basics:building_physics_-_basics:thermal_bridges:tbcalculation:examples:iwfs [2018/10/02 11:57] cblagojevicbasics:building_physics_-_basics:thermal_bridges:tbcalculation:examples:iwfs [2018/10/02 11:57] cblagojevic
Line 9: Line 9:
 As a two-dimensional approximation, which is also used in the context of certification for a construction system, it is recommended that the ground is taken into account and the distance of the interior wall from the floor slab edge assumed to be 1.5 metres. This procedure is demonstrated below using an example. As a two-dimensional approximation, which is also used in the context of certification for a construction system, it is recommended that the ground is taken into account and the distance of the interior wall from the floor slab edge assumed to be 1.5 metres. This procedure is demonstrated below using an example.
  
-{{ :picopen:innenwand_auf_bodenplatte_abb_2.png?600| }}+{{ :picopen:innenwand_auf_bodenplatte_abb_2.png?600 |}}
  
 {{ :picopen:innenwand_auf_bodenplatte_abb_3.png?400 |}} {{ :picopen:innenwand_auf_bodenplatte_abb_3.png?400 |}}
basics/building_physics_-_basics/thermal_bridges/tbcalculation/examples/iwfs.txt · Last modified: 2021/06/21 09:19 by nsukhija