basics:affordability:housing_companies_successful_cost_efficient_implementation
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
basics:affordability:housing_companies_successful_cost_efficient_implementation [2024/10/28 14:00] – yaling.hsiao@passiv.de | basics:affordability:housing_companies_successful_cost_efficient_implementation [2024/10/30 10:46] (current) – [See also] yaling.hsiao@passiv.de | ||
---|---|---|---|
Line 101: | Line 101: | ||
Since the construction costs are also recorded in parallel with the determined component qualities, a comparison of the cost potential can also be carried out in the same step. This makes it possible for the first time to check the achievement of the required NHT efficiency criteria in the context of the resulting investment cost potential very reliably and on a scientific basis during the competition process." | Since the construction costs are also recorded in parallel with the determined component qualities, a comparison of the cost potential can also be carried out in the same step. This makes it possible for the first time to check the achievement of the required NHT efficiency criteria in the context of the resulting investment cost potential very reliably and on a scientific basis during the competition process." | ||
+ | ---- | ||
+ | |||
+ | {{: | ||
---- | ---- | ||
+ | |||
===== See also ===== | ===== See also ===== | ||
Line 110: | Line 114: | ||
[[phi_publications: | [[phi_publications: | ||
- | [[: | + | [[https:// |
basics/affordability/housing_companies_successful_cost_efficient_implementation.1730120409.txt.gz · Last modified: by yaling.hsiao@passiv.de