planning:refurbishment_with_passive_house_components:airtightness:step-by-step_retrofit_-_airtightness_concept
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
planning:refurbishment_with_passive_house_components:airtightness:step-by-step_retrofit_-_airtightness_concept [2015/06/15 12:49] – [Shaft connecting the basement and attic floor] kdreimane | planning:refurbishment_with_passive_house_components:airtightness:step-by-step_retrofit_-_airtightness_concept [2015/08/04 18:05] (current) – kdreimane | ||
---|---|---|---|
Line 1: | Line 1: | ||
\\ | \\ | ||
====== Step-by-step retrofit: Airtightness concept ====== | ====== Step-by-step retrofit: Airtightness concept ====== | ||
- | + | {{:picopen:iee_.png?nolink |}} [[http:// | |
- | {{:picopen:newco-funded-iee-horiz.jpg?250}} [[http:// | + | |
**Author: Soeren Peper** | **Author: Soeren Peper** | ||
Line 12: | Line 11: | ||
For the Tevesstrasse project in Frankfurt am Main (multi-storey building with a total of 53 apartments), | For the Tevesstrasse project in Frankfurt am Main (multi-storey building with a total of 53 apartments), | ||
- | [{{ : | + | [{{ : |
The importance of developing a concept for airtightness at an early stage of step-by-step modernisation will be explained here using an example. | The importance of developing a concept for airtightness at an early stage of step-by-step modernisation will be explained here using an example. | ||
Line 83: | Line 82: | ||
Using this example case and the results of the airtightness measurements and leak detection, the need for a comprehensive concept for airtightness is clearly evident. | Using this example case and the results of the airtightness measurements and leak detection, the need for a comprehensive concept for airtightness is clearly evident. | ||
- | {{ : | + | [{{ : |
\\ | \\ | ||
Line 91: | Line 90: | ||
==== Literature ==== | ==== Literature ==== | ||
- | |[Feist/ | + | |[Feist/ |
- | |[Kaufmann et al. 2009]|Berthold Kaufmann; Søren Peper; Rainer Pfluger; Wolfgang Feist: Sanierung mit Passivhaus-komponenten, Planungsbegleitende Beratung und Qualitätssicherung Tevesstraße Frankfurt a.M., Bericht im Auftrag des Hessischen Ministeriums für Wirtschaft, Verkehr und Landesentwicklung, | + | |[Kaufmann et al. 2009]|Berthold Kaufmann; Søren Peper; Rainer Pfluger; Wolfgang Feist: Sanierung mit Passivhaus-Komponenten, Planungsbegleitende Beratung und Qualitätssicherung Tevesstraße Frankfurt a.M., Bericht im Auftrag des Hessischen Ministeriums für Wirtschaft, Verkehr und Landesentwicklung, |
|[Peper/ | |[Peper/ | ||
\\ | \\ |
planning/refurbishment_with_passive_house_components/airtightness/step-by-step_retrofit_-_airtightness_concept.1434365362.txt.gz · Last modified: 2015/06/15 12:49 by kdreimane