User Tools

Site Tools


planning:non-residential_passive_house_buildings:swimming_pools:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
planning:non-residential_passive_house_buildings:swimming_pools:start [2024/04/30 23:48] – [Case studies] jgrovesmithplanning:non-residential_passive_house_buildings:swimming_pools:start [2024/04/30 23:57] (current) – [Case studies] jgrovesmith
Line 21: Line 21:
 ===== Case studies ===== ===== Case studies =====
  
-The indoor swimming pool **__Lippe Bad in Lünen, Germany__** was one of two first pilot projects to be built based on the energy efficiency concepts developed in the baseline study carried out by the Passive House Institute. In order to verify that the concept and approaches in the afore mentioned baseline study worked (proof on concept) and in order to identify further energy saving potentials, the in-use energy performance of the pool was monitored in detail during the first 1.5 years of operation.\\ +The indoor swimming pool **__Lippe Bad in Lünen, Germany__** was one of two first pilot projects to be built based on the energy efficiency concepts developed in the baseline study carried out by the Passive House Institute. In order to verify that the concept and approaches in the afore mentioned baseline study worked (proof on concept) and in order to identify further energy saving potentials, the in-use energy performance of the pool was monitored in detail during the first 1.5 years of operation. Read more on the [[examples:non-residential_buildings:passive_house_swimming_pools:lippe_bad|monitoring of the Passive House indoor swimming pool in Lünen]].
-The following article from the 17th International Passive House Conference (2013), summarises the main findings from this monitoring: [[:examples:non-residential_buildings:passive_house_swimming_pools|Read more]]+
  
 The **__Bambados in Bamberg, Germany__**, also opened its doors to the public in 2011. Similarly to the Lippe Bad the in-use performance was monitored in detail for the first two years of operation. Details report of this montoring are available in German [[https://passiv.de/downloads/05_hallenbad_bambados_monitoring_endbericht.pdf|here]]. See also entry in the online [[https://passivehouse-database.org/index.php?lang=en#d_4921|Passive House Database ID: 4921]] The **__Bambados in Bamberg, Germany__**, also opened its doors to the public in 2011. Similarly to the Lippe Bad the in-use performance was monitored in detail for the first two years of operation. Details report of this montoring are available in German [[https://passiv.de/downloads/05_hallenbad_bambados_monitoring_endbericht.pdf|here]]. See also entry in the online [[https://passivehouse-database.org/index.php?lang=en#d_4921|Passive House Database ID: 4921]]
planning/non-residential_passive_house_buildings/swimming_pools/start.txt · Last modified: 2024/04/30 23:57 by jgrovesmith